Specifications for Conventional Water Treatment Plant

Ref : Schedule of Rates, MJP Pune region 2012-2013

Designing    (aesthetically),   providing,  constructing       and  commissioning Conventional  Water  Treatment  Plant consisting of all Civil, Mechanical and Electrical   works   including   cost   of providing  and  applying  epoxy  paint  to inside   surface   of   water   retaining structures in contact with chlorine and providing anti-termite treatment to entire structure  below groundlevel, mechanical  and  electrical  components of  various    sub-works  as  given  below,including  necessary  hydraulic  testing,structural   testing,   equipment   testing and trial run for a period of  3 months,etc. complete as directed by Engineer-in-charge (turn-key job).


1)   Aeration Fountain  - Plan area not lessthan 0.625 square metre per MLD

2)  Ventury   Flume   -     With   necessary  devices, consisting  of simple mechanical  indicator (Pedestal  type gauge)

3)  Flash  Mixer    -  Rapid  mixing  device,  detention  time  60  seconds  to  give velocity gradient 300 to 400 sec-1, vane mixer type conforming to I.S.  7090 of1985.

4)   Flocculator  - Conforming to I.S.7208-  1974 (Type-C) with detention period of   30 minutes.

5)    Clarifier  - Horizontal flow circular tank, detention  period    2-5  hours,  overflow rate  30 cubic metre per square metre per day (to be specified), Weir loading not  more  than 300  cubic  metre  per metre per day, with mechanical sludge scraper conforming to I.S. No.  10313-1982.

6)   Rapid Sand Filters and Filter House  -Filter  designed  for  filteration  rate  of 5,000 litres per square metre per hour,minimum 2 beds for plant upto 10 MLD,for larger plants as specified, filters to be located in filter house with roof
slab,pipe gallery and   platform minimum 5.5 metre in width.

a) Filter Sand - Effective size 0.45 to 0.70 mm, uniformity coefficient not more than 1.7, nor less than  1.3, depth of water
over sand  0.75 M, free board  50 cm, gravel 0.45 M in depth, sand and gravel conforming to I.S. 8491(i)-77, backwash
by  air  wash,  standard  appurtenances (to be specified), rate of flow controller, filter gauge, sand expansion gauge, etc.

b)  Wash  Water  Tank  -  Capacity  to  be specified and suitable to supply water to wash 2 filter units at a time where the
units are 4 or more.

c) Wash  Water  Pumps  -  Capacity  to  fill water tank in 1 hour with 100% standby.

d)  Air Blowers - Capable of delivering 600 LMP  per  square  metre  of  free  air,  of filter   area   at  underdrains (100% standby).


7)  Chemical House in Two Storeys

a)  Ground floor to accommodate  7 days'alum requirement and sundry storage.

b)   First  floor  to  accommodate  alum  and lime tanks. etc.

c)  Solution tanks - Minimum 3 tanks (one for preparation, second for dosing and third as standby), each tank capable of
giving  8 hours maximum dose without interruption,  minimum  free  board  0.30 M, trays for dissolving, level indicator,
mechanical  agitation  devices,  solution feed  and  drain  lines,  solution  feed device  (constant head device, strength
of solution upto  10% only) conforming to I.S. 9222 Part-I 1979.

 8) Pure Water Sump and Sump House.

a) Capacity  of  sump  -  One  hour  of designed flow.

b)   Pump House - Pump house of required size over the sump or by the side.


9)   Store House - Suitable for alum storage of   three   months'   requirement   in monsoon  with  10%  extra  capacity  for other sundry articles.


10)  Vacuum feed type Chlorinators - Make  to be approved by MJP.

11)  By  pass  arrangements  -  C.I.or  M.S. pipes.

12) Drainage  arrangements    -  RCC  pipes  upto plot boundary.

13) Electrical installation - Both internal and   external including entire plant area.

14)  Laboratory    equipment     -     As    per requirement (to  be  specified  during tendering).

15) Sanitary  blocks    -  Carpet  area   -    15 square metre minimum upto 25 Mld and 25 square metre above 25 Mld.


16)   Administrative block and internal road -To accommodate office room, chlorine room,  laboratory  room,  panel  board room, blower room etc. and WBM road to connect all units from main gate of plot.      

 